OKTO Art House is an ART concept. 2 blocks of 35 floors each. ●Completion of the construction of block B with infrastructure- in a white frame in the second quarter of 2027 ● Completion of the construction of Block A- December 2027 ● There are 4 elevators in block A, 29 apartments per floor ● Block B has 3 elevators- 2 passenger and 1 cargo, 19 apartments per floor ● Closed area Maintenance: $ 1.20 m2 Infrastructure: ● Children's art school on weekends ● On-site pharmacy, shops, 1 F&B Outlet (Like Entree in Tbilisi) ● Closed area ● Children's playground ● Walking area/gazebos ● Simulators on the territory of the complex. ● Stadium ● Underground parking - 640 places ● The pool between the blocks ● Gym ● Reception/Lobby